Intermountain Health – Cooling Tower Replacement
CORE Architecture has a strong, ongoing partnership with Intermountain Health, supporting their mission to deliver exceptional care through high-performing facilities across Utah. As part of this relationship, CORE was selected to assist with a critical infrastructure upgrade at Intermountain’s Lake Park corporate campus in West Valley City, Utah.
This 200,000 SF, four-story administrative building required the replacement of its aging cooling tower, which had reached the end of its service life. The new system needed to meet modern performance standards, improve energy efficiency, and integrate smoothly with the existing structure.
As a subconsultant to the structural design team, CORE provided specialized architectural consultation to ensure the success of the mechanical system replacement. Our responsibilities included the design of custom handrails, selection and coordination of equipment screening materials, and architectural detailing for all necessary roof and penthouse penetrations to accommodate the upgraded cooling infrastructure.
The project demanded precise technical coordination and a careful balance between utility, code compliance, and architectural cohesion—an approach CORE consistently brings to our work with Intermountain Health across multiple projects.
This initiative demonstrates CORE Architecture’s expertise in facility retrofits, mechanical system integration, and supporting complex healthcare infrastructure upgrades. Through our collaborative relationship with Intermountain, we continue to contribute to the enhancement of healthcare environments that support both operational excellence and long-term facility resilience.
- Date : 2021
- Client : Intermountain Health
- Construction Cost : Undisclosed
- Size : Not applicable
- Location : West Valley, Utah